Energy-saving ceramic fiber muffle furnace operating procedures

Energy-saving ceramic fiber muffle furnace operating procedures

Energy-saving ceramic fiber muffle furnace technical parameters:

model

Studio size

Rated temperature °C

Rated power (KW)

voltage

Remarks

SX3-1.5-10

165*120*105

1000 ° C

1.5

220V 50HZ

SX3-2-12

165*120*105

1200 ° C

2

SX3-2-13

165*120*105

1300 ° C

2

Double outer casing

SX3-3-10

300*200*150

1000 ° C

3

SX3-3-11

300*200*150

1100 ° C

3

SX3-3-12

300*200*150

1200 ° C

3

SX3-3-13

300*200*150

1300 ° C

3

U-shaped silicon carbon rod heating double shell

SX3-4-10

300*300*300

1000 ° C

4

SX3-4-12

300*300*300

1200 ° C

4

SX3-4-13

300*300*300

1300 ° C

4

U-shaped silicon carbon rod heating double shell

SX3-5-10

400*400*400

1000 ° C

5

SX3-7.5-12

400*400*400

1200 ° C

7.5

380V 50HZ

Four-sided heating lining furnace bottom plate double shell

SX3-6-13

400*400*400

1300 ° C

6

U-shaped silicon carbon rod heating double shell

SX3-7.5-10

500*500*500

1000 ° C

7.5

Four-sided heating lining furnace floor

SX3-8-11

500*500*500

1100 ° C

8

Four-sided heating lining furnace bottom plate double shell

SX3-4-16

200*150*150

1600 ° C

4

220V 50HZ

Silicon molybdenum rod heating

Energy-saving ceramic fiber muffle furnace operating procedures:

  1. Before the furnace is opened, the gas pipeline valve sealability and the pressure on the gas pipeline should not be checked below the specified value.

2. The operation of the empty furnace test push rod mechanism, the tie rod mechanism and the lifting mechanism.

3. Loosen the compression spring to the specified size range.

4. Adjust the water level of the water seal, open the valve through which the water seal is discharged, and close the valve through the water seal.

5. Close the furnace door at the feeding end, open the furnace door at the discharge end, and close the furnace door when the kerosene is sprayed out to form a misty flow.

6. Point the burner of the feed chamber.

7. Exhaust gas should be discharged through a valve that does not pass through the water seal.

8. Intermittent production first carburizes the furnace.

9. When the part is placed, the distance between the part and the part is not less than 5 mm; the edge of the part does not exceed the length of the base plate and the specified height.

10. To quickly switch the feed and discharge doors, but the speed of the push-pull rods should be smooth.

11. The position of the part in the pre-cooling chamber should be right below the thermocouple.

12. Only 24 chassis can be filled in the furnace, and the feeding must be pulled first and then pushed.

13. When the furnace is shut down, the furnace zone should be lowered to the same temperature, and then the natural cooling will begin.

14. Muffle furnace equipment cleaning:

15. After quenching the chassis or fixture, return to the pre-cooling chamber to remove oil.

16. It is found that the exhaust pipe is blocked (the pressure in the furnace is suddenly increased) and should be cleaned up immediately. First open the exhaust valve that does not pass the water seal, and then close the exhaust valve of the water seal. After cleaning, open the exhaust pipe valve of the water seal first, and then close the exhaust valve without water seal.

17. Muffle furnace notes:

(1) Always pay attention to the combustion conditions of various districts and the pressure of gas;

(2) When the furnace door is opened, it cannot stand in the middle to prevent the flame from being burned;

(3) Pay attention to whether the burner of the department is burning and check whether the wedge door is leaking with a torch;

(4) When the flame of the burner is extinguished during work, the gas valve should be closed immediately, and then the air valve should be closed;

(5) If the part is dropped during work or the wedge-shaped door switch is not working, the feeding should be stopped and the parts removed.

Shangyu Xingxing Instrument Equipment Co., Ltd. is located in Daoxu Town, Shangyu District, Shaoxing City, Zhejiang Province. It is an enterprise integrating production, product research and development, processing and trade. The company's main products: drying box series, incubator series, laboratory muffle furnace series, distilled water series, as well as clean workbench, air shower, fume hood, biological safety cabinet and other complete purification equipment.

The company has a strong technical research and development team, a strong after-sales guarantee service system, is the linger of the Chinese laboratory complete sets of equipment manufacturers, welcome customers to buy.

Industrial Applications Nitrile Gloves

Industrial Applications Nitrile Gloves,Industrial Nitrile Gloves,Food Grade Disposable Gloves,Food Grade Nitrile Gloves

Puyang Linshi Medical Supplies Co., Ltd. , https://www.linshimedicals.com